Tough job at Hessenpoort, but work N340 is on schedule | Instagram

“We are still busy there 24 hours a day with the connection of the new N340 to the A28. At the Hessenpoort we have used most of the entrances and exits for a long time, only now are all exits closed. There we first have to remove the old asphalt, raise the new route with a sand bed and rubble track, and then apply several layers of asphalt on top. The road will open at 6 a.m. Monday.

See also  Instagram did not delete old photos and messages despite promise to do so - IT Pro - News

Leave a Comment