A Dutch court has ruled that a tenant living on the ground floor of a multi-family building cannot install solar panels on the roof against the wishes of the upstairs neighbor who has occupied her home since 1980. The local canton judge sided with the retired upstairs resident, who raised concerns over missing installation plans, insurance risks, and her own future building projects.
Court Blocks Solar Panel Installation Over Missing Plans
The canton judge denied the ground-floor tenant’s request because the project lacked concrete operational details. According to the court proceedings, the resident had not yet specified the exact quantity or type of solar panels and technical installations he intended to use. Furthermore, no recognized professional installer had been chosen to oversee the work, and the potential consequences for the building’s property insurance remained entirely unclarified.
Rooftop Access and Future Construction Plans
The upstairs neighbor, who is now retired, voiced multiple objections regarding physical access and her own property aspirations. The roof of the building is only accessible via a pull-down ladder located directly inside her bedroom. She argued that it is unreasonable to expect her to grant external installers constant access through her private living quarters.

Additionally, the long-term resident stated she has concrete plans to construct a rooftop terrace. Installing solar panels across the roof space would permanently obstruct her ability to build the terrace. Beyond access and construction disputes, she also cited personal sensitivity to noise, expressing fear that she would constantly hear the inverter and electrical hardware. She additionally raised concerns regarding the fire safety risks associated with photovoltaic systems.
Frequently Asked Questions
Why does the upstairs neighbor control roof access?
The roof of the multi-family property can only be reached through an extendable ladder located inside the second-floor bedroom of the upstairs neighbor, who has lived in the building since 1980.
What specific safety and insurance issues did the court cite?
The canton judge noted that the ground-floor tenant failed to provide a concrete installation plan, had not hired an authorized installer, and left it unclear whether the building’s insurance policy would cover the solar array.
What alternative plans does the upstairs neighbor have for the roof?
The retired resident stated in court that she plans to build a rooftop terrace, a project that would be blocked by the placement of solar panels.