Seven INKA iE305 Commuter Trains Return to Jakarta Service
Seven INKA iE305 trainsets have returned to passenger service on Jakarta’s KRL commuter network following a comprehensive general checkup, restoring normal rolling stock circulation across all lines. PT Industri Kereta Api (Persero), known as INKA, and PT Kereta Commuter Indonesia (KAI Commuter) confirmed the deployment in an official statement published by INKA on October 6, 2026. Railway Supply reported that the electric trainsets belong to the CLI-225 and CLI-226 series manufactured by INKA, with all seven units undergoing technical evaluations at the Manggarai and Depok overhaul facilities.
General Checkup and Technical Scope at Overhaul Facilities
The overhaul process involved detailed engineering inspections of primary components and critical operating systems across each trainset. INKA collaborated with KAI Commuter and other industry stakeholders, deploying dedicated engineering and quality assurance teams to resolve outstanding technical notes before clearing the rolling stock for active duty. Nanang Agung Rohmandiyas, Senior Manager Corporate Communication and Representative Office at INKA, confirmed the return of all seven trainsets and apologized to passengers for any prior travel disruptions. He stated that INKA’s technical team will maintain close coordination with KAI Commuter to address any minor faults detected during daily runs, noting that ongoing inspections and system refinements will persist.
Regulatory Oversight and Safety Prioritization in Madiun
Preparations for the fleet restoration began weeks prior, marked by a formal coordination meeting held on September 11, 2026, in Madiun between INKA and PT Kereta Api Indonesia (Persero), or KAI. Nanang stated during the proceedings that all participating entities prioritized verifying that every system aboard the KRL iE305 units met optimal operational standards. Regulators and operators jointly executed these inspections, focusing specifically on mechanical and electrical systems directly tied to passenger safety and vehicle reliability. KAI President Director Bobby Rasyidin emphasized during the Madiun meetings that safety remains the absolute priority across all railway operations.

Bogor Line Capacity and Passenger Volume Demands
Karina Amanda, VP Corporate Secretary at KAI Commuter, explained that completing the maintenance cycle ensures fleet readiness to satisfy heavy daily passenger demand, particularly along the high-traffic Bogor Line. The reintroduction of the CLI-225 trainsets directly supports capacity requirements on this vital corridor. According to network figures released in the statement, the Bogor Line transported 119,388,432 passengers through the third quarter of 2026, accounting for 43.98% of the total 271.48 million users across the Commuter Line Jabodetabek network. Fleet normalization also restored operations on the Soekarno-Hatta Airport Commuter Line, freeing up two trainsets that had temporarily served the Tanjung Priok route during the maintenance period to maintain scheduled peak-hour headways.
Frequently Asked Questions About the KRL iE305 Return
Where were the seven INKA iE305 trainsets inspected?
The seven trainsets underwent their general checkups at the Manggarai and Depok overhaul facilities under the supervision of INKA and KAI Commuter engineering teams.
How many passengers did the Bogor Line carry in 2026?
The Bogor Line transported 119,388,432 passengers through the third quarter of 2026, representing nearly 44 percent of the total network ridership.
Which specific train series returned to the Commuter Line?
The returned electric railcars belong to the CLI-225 and CLI-226 series built domestically by PT Industri Kereta Api (Persero).
Worth a look