Winnipeg Police HQ Flood: 2 Charged with Mischief – Station Duty Closed

by Dr Natalie Singh - Health Editor
0 comments

Winnipeg Police Headquarters Flooded After Vandalism, Two Arrested

Winnipeg Police Headquarters experienced significant flooding on February 14, 2026, after two individuals intentionally opened emergency water supply valves, causing extensive damage. The incident occurred at the tower located at 266 Graham Avenue. Two suspects have been arrested and are facing charges.

What Happened?

At approximately 6:00 p.m. On February 14, 2026, Winnipeg Police were alerted to a flooding incident at their headquarters. Initial reports suggested a possible watermain break or burst pipes. However, investigation revealed that a 51-year-old man and a 36-year-old woman deliberately opened several emergency water supply valves in the upper stairwells of the adjoining tower building.

The Winnipeg Fire Paramedic Service responded to the scene and secured the valves. The resulting water pressure quickly overwhelmed the system, flooding areas within the police headquarters. The extent of the damage is still being assessed.

Arrests and Charges

Police quickly identified the suspects and located them in the 200 block of Graham Avenue shortly after 11:00 p.m. Both individuals are facing six counts of Mischief Over $5,000 and were released on undertakings. Winnipeg Police Service News Release

Impact on Public Services

While uniform operations are not affected, in-person reporting at Station Duty, located at 245 Smith Street, is closed on Sunday, February 15, 2026. Daily updates on the status of Station Duty will be provided. Citizens are encouraged to utilize online reporting options.

For emergencies, dial 911. For non-emergency situations, call 204-986-6222. CBC News

Ongoing Assessment

Authorities are currently evaluating the full extent of the damage caused by the flooding. The assessment process is expected to take time. CTV News

Key Takeaways

  • Two individuals were arrested for intentionally flooding Winnipeg Police Headquarters.
  • The flooding occurred after emergency water supply valves were opened.
  • Station Duty at 245 Smith Street is temporarily closed, but online reporting remains available.
  • The extent of the damage is still being assessed.

Related Posts

Leave a Comment