Wesel District: Public Announcement – Facility Permit Application
Announcement in accordance with Section 10 Paragraphs 3 and 4 of the Act to Protect Against Harmful environmental Impacts Due to Air Pollution, Noises, Vibrations and Similar Processes (Federal Immission Control Act – BImSchG) and i. V. with sections 8 and 9 of the Ninth Ordinance on the Implementation of the Federal Immission Control act (Ordinance on the Approval Procedure – 9th bimschv) – in the currently valid version.
Text of the publication
Homa Raiffeisen GmbH, Hafenstraße 11-13 in 46483 Wesel, has been issued a permit in accordance with Section 16 BImSchG for the construction and operation of a facility, dated November 6th, 2025, encompassing:
* According to no. 7.21 of Annex 1 of the Fourth Ordinance on the Implementation of the Federal Immission Control Act (Ordinance on Facilities requiring Approval – 4th BImSchV) for grinding food, animal feed or similar vegetable substances not intended as food or animal feed (mills) with a production capacity of 300 tons of finished products or more per day.
* According to 9.11.2 of annex 1 of the 4th BImSchV,open or incompletely closed facilities,with the exception of facilities covered by number 9.3, for the collection of cereals, oilseeds or pulses, provided that 400 tonnes or more can be moved per day and 25,000 tonnes or more can be handled per calendar year.
The application pertains to the property located at Hafenstraße 11-13, 46483 Wesel, Wesel district, corridor 39, parcel 111, 265.
The application concerns a planned increase in the production capacity of the animal feed facility from less than 300 t/day to 800 t/day,thereby classifying the facility under Section 7.21 of Annex 1 to the 4th BImSchV.
This capacity increase will involve the construction of a new machine house atop the existing mixing plant, housing a new mill and mixer. Weighed components will be elevated, chopped, and mixed with minerals in this new structure. The existing machines will be dismantled following the commissioning of the new equipment. Additionally, a second feed press will be installed.
Consequently, the system described in 9.11.2 of Appendix 1 of the 4th BImSchV will become an ancillary system.
The project is hereby made public in accordance with Section 10 Paragraph 3 BImSchG.
In accordance with the 4th BImSchV and the provisions of the BImSchG, the proposed project requires approval under these regulations.
For systems listed in column c of Annex 1 of the 4th BImSchV with the letter G, an approval procedure must be conducted according to Section 10 BImSchG, including public participation and adherence to the relevant provisions of the 9th BImSchV. this applies to plants as defined in No. 7.21 of Annex 1 of the 4th BImSchV for grinding food, animal feed or similar vegetable substances not intended as food or feed (mills) with a production capacity of 300 tonnes of finished products or more per day or 600 tonnes of finished products or more per day, provided that the plant is not in operation on more than 90 consecutive days per year.
The system is marked with the letter E in column d of annex 1 of the 4th BImSchV, placing it under the regulations of the Industrial Emissions Directive.
Okay, here’s a breakdown of the provided text, formatted for clarity and with a focus on extracting key information. I will also highlight potential areas for fact-checking (though the document itself is a primary source, the legal references shoudl be verified for current status).
subject: Public Notice Regarding Approval Process for a Project – Immission Control, Wesel District
Date of Notice: December 8th, 2025
Issuing Authority: Wesel District, The District Administrator (represented by Thomas, signature provided)
Contact Information:
* Department: 66-1-4 Immission Control, Room 524
* Address: Reeser Landstraße 31, 46483 Wesel
Office Hours:
* Monday: 8:30 a.m. – 12:00 p.m. & 2:00 p.m. – 4:00 p.m.
* Tuesday: 8:30 a.m. – 12:00 p.m. & 2:00 p.m. – 4:00 p.m.
* Wednesday: 8:30 a.m. – 12:00 p.m. & 2:00 p.m. – 4:00 p.m.
* Thursday: 8:30 a.m. – 12:00 p.m. & 2:00 p.m. – 4:00 p.m.
* Friday: Closed 8:30 a.m. – 12:30 p.m. (Note: This appears to be a typo, stating “closed” then listing hours)
Project Details & Deadlines:
* Application Documents: Available online at: https://share.krzn.de/exs/externalshare/kreis-wesel/dUuwetmW/
* Deadline for Application Review: January 19, 2026
* Objection Period: December 12th, 2025 – February 19th, 2026
* Objection Submission: Must be in writing.
* objection Requirements:
* Full name (family name)
* Full address
* Legible handwriting
* Signature
* No uniform/reproduced objections without clear identification of signatories on each page (or a natural person representative).
* Discussion/Hearing: Expected to be held as a video conference on March 23, 2026.
Legal Basis/references:
* Section 10 Paragraph 3 BImSchG (Federal Immission Control Act – regarding objections)
* Section 17, Paragraph 2, Sentence 1 of the administrative Procedure Act for the State of North Rhine-Westphalia (VwVfG NRW)
* Section 4 Paragraph 1 bimschg (regarding approval or rejection)
Crucial Notes:
* Objections based on private law titles must be pursued through the ordinary courts.
* Objectors can request their names and addresses be anonymized (unless the information is essential for evaluating the objection).
* The decision (approval or rejection) might potentially be announced publicly rather of directly to objectors.
Fact-Checking/verification Points:
- BImSchG References: Verify the current status and wording of Sections 4 and 10 of the Federal Immission Control Act (BImSchG). Laws are subject to change.
- VwVfG NRW Reference: Verify the current status and wording of Section 17, Paragraph 2, Sentence 1 of the Administrative Procedure Act for the State of North Rhine-Westphalia (VwVfG NRW).
- Link Validity: Confirm the link to the application documents (https://share.krzn.de/exs/externalshare/kreis-wesel/dUuwetmW/) is still