Following the total loss of the Lincoln Avenue School building to a fire in June, the district has finalized a relocation plan for the 2024–2025 school year. Students and faculty will operate out of the nearby high school facility, according to official statements from district administrators. The move ensures that the academic calendar remains intact while the district assesses long-term reconstruction options.
Relocation to High School Facility
The district’s decision to move operations to the high school campus was driven by the need for immediate, functional space that meets safety and instructional requirements. According to the official school district website, the transition involves reconfiguring specific wings of the high school to accommodate the younger student population. This strategy allows the district to keep the displaced school community together rather than splitting classes across multiple temporary sites.

The high school location was chosen for its existing infrastructure, including cafeteria services, gymnasiums, and updated technology, which the district stated are essential for maintaining educational continuity.
Timeline for Reconstruction and Recovery
While the immediate focus remains on the current academic year, the path forward for the Lincoln Avenue site involves a multi-phase recovery process. According to reports from the local fire marshal’s office, the investigation into the June blaze concluded that the structural damage was significant enough to render the original building irreparable.
The Board of Education is currently working with state authorities to determine funding for a potential rebuild. Preliminary discussions suggest that any new construction will involve updated fire-suppression systems and modern architectural standards. As of now, no firm date has been set for the groundbreaking of a replacement facility.
Impact on Students and Families
The displacement has required significant adjustments for families, particularly regarding transportation and daily schedules. The district has confirmed that bus routes have been updated to reflect the change in destination.
Key Operational Changes
- Transportation: New bus routes have been established to drop students at the high school rather than the original Lincoln Avenue location.
- Instructional Space: Classrooms have been partitioned to ensure age-appropriate environments within the high school building.
- Extracurriculars: The district is coordinating schedules to ensure that both high school students and the relocated elementary students have adequate access to shared facilities like the auditorium and athletic fields.
Frequently Asked Questions
Will the school remain at the high school permanently?
No, district officials have stated that the high school location is a temporary measure designed to house students while the district plans for a permanent replacement.
Are there changes to the school day schedule?
The district has implemented staggered arrival and dismissal times to manage the increased volume of traffic on the high school campus. Parents are encouraged to monitor the official district portal for real-time updates on scheduling adjustments.
How is the reconstruction being funded?
Funding for the future replacement facility is currently being reviewed by the Board of Education in coordination with state-level grants and insurance settlements. Detailed budget reports will be presented at future board meetings, which are open to the public.