Beijing’s Fengtai District opened bidding on Wednesday for operators to redevelop the 21.78-hectare Fengtai Sports Center and five surrounding land parcels, part of a broader push to modernize aging Olympic-era infrastructure and expand neighborhood fitness access.
“Five sports land parcels basically meet ‘ready-to-build’ conditions. Together with the Fengtai Sports Center and the air-dome sites, the variety can fully meet the differentiated and diversified project construction needs of various operators,” Fengtai Sports Bureau Director Yang Hua said at the 2026 Fengtai Sports Resources Promotion Conference. The center, built for the 1990 Asian Games and later used for softball during the 2008 Olympics, includes a stadium, a technology sports hall, track and field, baseball and softball fields, a natatorium, caged football pitches and a karting track. The district listed the entire complex as existing stock awaiting renewal. Five new parcels were offered alongside it. The Yalinxi site, near the South Third Ring Road and Caihuying South Road, spans more than 23,000 square meters and is positioned as a district-level fitness and event hub. The Dahongmen parcel, over 19,000 square meters in the South Central Axis vitality zone, targets trend sports.
The Huafang West Road site, 11,000 square meters beside the Nanyuan Forest Wetland Park, is slated for a “forest-oxygen” sports park blending greenery, all-age access and retail. The Science Park parcel, exceeding 15,000 square meters in Zhongguancun Fengtai Park, aims to serve high-frequency knowledge-worker traffic. The smallest, Xincun at 3,600 square meters, sits next to Beijing Fengtai Railway Station to capture commuters and residents.
Three additional plots on former demolition land were designated for air-supported dome venues, lowering entry barriers for smaller operators. Yang published direct contact numbers for business leads and the district discipline-inspection hotline, stating the process would accept full public supervision.
As of the conference, Fengtai had planned 164 public sports facilities totaling roughly 1.37 million square meters, with 497 dedicated fitness venues and more than 13,000 fitness-path equipment sets installed, advancing the district’s “15-minute fitness circle” target.
Related reading
- Ronaldo Scores 986th Goal, Misses Penalty as Al Nassr Lose 3-1 to Al Ahli
- Verstappen Receives Warning, Avoids Grid Penalty for Russell Clash
- Leafs meet with Rory McIlroy and his sports psychologist; cancel practice after 8 consecutive losses (newsylist.com)
- Annapolis Churchill Playoff Friday Shapes District Seeding, Universal Hub Reports (news-usa.today)