Indonesia Announces Plans for Massive National Sports Center in West Java
The Indonesian government has unveiled an ambitious plan to construct a sprawling national sports complex in the Rancabungur district of Bogor, West Java. This major infrastructure project, announced on May 18, 2026, aims to centralize athletic training and elevate the country’s competitive standing on the world stage.
A Hub for Athletic Excellence
The proposed facility, officially designated as the National Sports Academy and National Team Training Center, is designed to serve as a comprehensive hub for the nation’s elite athletes. According to the Ministry of Youth and Sports, the project will cover 500 hectares in the Candali-Cimulang area of Rancabungur.

The complex is being built to support 21 priority sports identified by President Prabowo Subianto. These disciplines range from aquatic sports and rowing to badminton, rock climbing, soccer and various martial arts. The ministry emphasized that the facility is intended to foster the development of world-class talent through an integrated approach.
Integrated Facilities and Education
The vision for the site extends well beyond traditional training grounds. The ministry plans to incorporate a wide array of support infrastructure, including:
- Advanced Competition Arenas: International-standard facilities tailored for the 21 priority sports.
- Educational Support: A dedicated athlete school serving elementary, middle, and high school students.
- Research and Development: Specialized centers focused on sports science to optimize athlete performance.
- Residential Infrastructure: Dormitories to house athletes during their training tenures.
Ministry Secretary Gunawan Suswantoro noted that the academy will draw talent from across the country, utilizing a rigorous selection process focused on individual performance and long-term potential.
Investment and Timeline
The construction of this massive sports center represents a significant investment in Indonesia’s sporting future. The project is estimated to cost approximately Rp5 trillion (US$277 million). The government has outlined a three-year construction timeline, with the Ministry of Youth and Sports targeting full completion by 2029.
Key Takeaways
- Location: The project is situated on 500 hectares in Rancabungur, Bogor, West Java.
- Strategic Goal: To support 21 priority sports and develop world-class athletes through an integrated national academy.
- Project Scale: The development includes specialized training arenas, research centers, dormitories, and an athlete-focused school system.
- Budget and Timeline: The estimated cost is Rp5 trillion (US$277 million), with a target completion date of 2029.
As construction begins, the project stands as a cornerstone of the current administration’s commitment to athletic development, aiming to provide Indonesian youth with the resources necessary to compete at the highest international levels.