Central Asia moved toward a common electricity market in November 2026 when an international tender opened for a pilot trading platform linking Kazakhstan, Kyrgyzstan, Uzbekistan and Tajikistan, Novastan reported.
The ten‑year Regional Electricity Market Interconnectivity and Trade (REMIT) programme envisages indicative financing of more than $1 billion and aims to lift annual cross‑border trade to at least 15 billion kilowatt‑hours, according to the World Bank.
Cross‑border trade now covers roughly 3 % of regional demand, while demand could triple by 2050 under a business‑as‑usual scenario, Novastan reported.
“Countries currently need to maintain their own reserve capacity to meet peak demand,” wrote Markus Friedrich Schneider, an independent economic analyst specialising in Central Asian economies. “Regional coordination could partially redistribute this burden.” He told Novastan English the principal benefit may lie in reducing the overall cost of ensuring energy security rather than simply increasing export revenues.
Kazakhstan’s expanding metallurgy, chemicals and critical‑mineral processing sectors are driving demand for reliable power. The country has substantial thermal capacity but relies on imports at times because of growing consumption and ageing plants, Novastan reported. Southern Kazakhstan in particular could gain supply reliability and lower risks for new industrial projects, though trade without environmental cost accounting could prolong coal‑fired generation.
Uzbekistan, hosting the Coordinating Dispatch Centre Energia in Tashkent, is investing heavily in solar and wind. A regional market would let it buy during shortages and sell temporary surpluses, while economically attractive hydropower imports could free natural gas for chemicals and higher‑value manufacturing, Novastan reported. Operator independence and equal access to infrastructure remain essential, Schneider wrote.
Kyrgyzstan and Tajikistan hold large reservoir‑based hydropower potential, but seasonal river flows and winter demand create their own shortages. As solar and wind expand across the region, demand for balancing services from flexible hydro plants may rise, Schneider noted. Capturing that revenue requires dedicated market mechanisms, long‑term contracts, payment guarantees and agreed water‑management arrangements for projects such as Kambarata‑1 and Rogun.
Turkmenistan is not among the initial pilot participants. Its gas reserves offer electricity‑export potential, but profitability depends on the opportunity cost of gas versus direct gas exports, Novastan reported. Joining later could entail additional adaptation costs as common technical and commercial standards emerge.
The proposed market design envisages trading in U.S. dollars.
An illustrative purchase of one billion kWh at $0.05 per kWh would cost $50 million; a 10 % dollar appreciation would raise the importer’s local‑currency cost by 10 % if the dollar price stays unchanged, Novastan reported. Currency‑risk management, payment guarantees and arrears‑prevention mechanisms will be essential.
Lower system costs from trade do not automatically translate into lower retail tariffs. National subsidies and regulatory frameworks differ, and higher export prices could strengthen incentives to sell abroad, Schneider wrote. For industrial consumers, reliability matters as much as price: reduced outage losses may offset moderate spending increases.
The water‑energy nexus remains a core constraint. Kyrgyzstan and Tajikistan need winter power, while downstream neighbours require water for summer agriculture. Affordable winter electricity imports could reduce the need to release reservoir water for power generation, but this requires reliable supply commitments and coordinated reservoir management, Schneider wrote.
European companies may find opportunities in grid modernisation, storage and digital management systems.
Chinese manufacturers offer energy equipment and high‑voltage infrastructure, while Gulf investors could expand renewable portfolios across Central Asia, Novastan reported. Attracting foreign capital should go hand in hand with developing domestic skills and localising production to avoid entrenching technological dependence.
The World Bank estimates stronger regional connectivity could generate economic benefits of up to $15 billion by 2050, a figure that includes reduced capital expenditure, more efficient use of existing capacity and lower outage losses — not guaranteed export revenues, Schneider wrote.
Initial modernisation costs may be substantial, and currency fluctuations, rising construction costs and project delays could erode anticipated gains.
If the preliminary implementation schedule is met, initial trading could begin in late 2028 or early 2029, Schneider wrote. This remains an analytical scenario rather than an officially approved launch date. A favourable scenario would add balancing services, expanded cross‑border connections and Turkmenistan’s accession; insufficient grid capacity and financial‑settlement disagreements could leave the market as only a supplementary exchange mechanism.
Keep reading