São Paulo’s main artificial-intelligence data-center cluster withdraws an estimated 16.1 million cubic meters of water each year, a volume equal to the annual use of more than 100,000 Brazilian households, according to a modeling study published in Cambridge Prisms: Water.
The 550-megawatt IT load sits inside the Alto Tietê watershed, which supplies drinking water to over 20 million people and is already classified by Brazil’s National Water Agency and the World Resources Institute’s Aqueduct platform as facing high-to-critical baseline water stress, the study reports.
Direct evaporative cooling accounts for 8.66 million cubic meters, or 53.7 percent of the total, while the remaining 7.45 million cubic meters are “virtual water” evaporated at hydroelectric reservoirs and thermoelectric plants that feed the grid.
Drought scenario raises footprint 27 percent
When the researchers modeled the September 2021 drought — when low reservoirs forced grid operators to substitute hydropower with water-intensive thermal generation — the cluster’s indirect water consumption climbed to 9.48 million cubic meters, a 27.2 percent increase over baseline conditions. “This operational surge intensifies competition for scarce freshwater, pitting commercial digital infrastructure directly against municipal drinking water and agricultural irrigation during drought emergencies,” the authors wrote.

Efficiency and reservoir accounting swing estimates widely
Sensitivity analyses show the footprint could fall to 9.1 million cubic meters using a run-of-river factor of 0.1 cubic meters per megawatt-hour or rise to nearly 26 million cubic meters using a marginal reservoir depletion factor of 4.0 cubic meters per megawatt-hour.
The choice of reservoir evaporation factor matters more: applying a run-of-river factor of 0.1 cubic meters per megawatt-hour drops the total to 9.1 million cubic meters, while a marginal depletion factor of 4.0 m³/MWh pushes it toward 26 million cubic meters.
Corporate renewable claims may obscure water risk
The authors argue that sourcing 100 percent renewable electricity from drought-prone hydro grids risks greenwashing, because “renewable branding obscures severe impacts on freshwater availability and aquatic biodiversity.” Large Brazilian dams have historically driven reservoir-related deforestation, biogenic greenhouse-gas emissions and downstream ecological disruption, the study notes.
Policy urges mandatory water-use reporting for data centers
The paper urges Brazil’s National Water Agency and National Electric Energy Agency to require mandatory reporting of both direct and virtual water use by data-center operators. It also calls for integrating digital-infrastructure permitting with river-basin management, incentivizing water-efficient cooling such as direct liquid cooling and closed-loop air-cooled chillers, and steering new development toward basins with low water stress.
Latin American AI traffic projected to triple by 2030
Industry projections cited in the study indicate AI data traffic across Latin America will triple by 2030, potentially driving the São Paulo cluster’s annual water footprint to between 45 million and 50 million cubic meters if cooling technologies and the power mix remain unchanged.
Keep reading
- Republican Lawmakers Break With Trump, Demand Investigations Into White House Pressure on Nvidia Board
- Amnesty: 15 Premature Babies Died After Israeli Siege of Gaza’s Al-Shifa Hospital
- Pregnancy Shrinks Brain Volume 3.5%, Study Finds; Changes Are Normal, Not Alarming (archyde.com)
- Newborn Hepatitis B Vaccination Drops to 65.6% in 2026, Study Finds (archyworldys.com)