Eagle Rock residents swarmed a community meeting at Occidental College on Thursday night to oppose a dedicated bus lane planned for Colorado Boulevard, LA Times reported.
The fight over the North Hollywood to Pasadena Bus Rapid Transit project is the first big public test for Councilmember Ysabel Jurado, who took office in December representing Council District 14. Residents carried signs reading “No Bus Lane!” and pressed Jurado to demand shared lanes instead of a dedicated busway through the neighborhood’s 1.2-mile commercial strip on Historic Route 66.
Metro’s $429-million project would convert one vehicle lane in each direction into bus-only lanes along Colorado Boulevard between Eagle Rock Boulevard and Townsend Avenue. The agency said the corridor has no parallel arterial streets to absorb displaced traffic. Construction, delayed from fall 2024, is now scheduled to begin in January and last roughly 16 months.
“What are the street improvements and what’s that schedule going to be? Because it is going to interrupt this community and the small businesses,” Jurado said at the meeting. She told LA Times she has met monthly with Metro to advocate for the community and recently convened a Zoom session with Metro and the mayor’s office.

The project aims to link the San Fernando and San Gabriel valleys with 19 miles of rapid bus service connecting North Hollywood, Burbank, Glendale, Eagle Rock and Pasadena. Zero-emission electric buses would cover the full route in about 66 minutes, Metro estimates. Funding comes primarily from Measure M, the sales tax voters approved in 2016.
Colorado Boulevard design eliminates left turns and parking
The Eagle Rock segment would remove multiple left-turn lanes and approximately 198 street parking spaces, CBS News reported. Metro spokesperson Anthony Crump told the meeting the agency has “made some accommodations for keeping some of the parking on the street there,” but maintained that mixed-flow lanes would defeat the project’s purpose.
“There are some sections that we call mixed flow, where the buses travel in the same lanes with regular cars,” Crump said. “However, we really find the biggest time savings are when those buses are in bus-only lanes.”
Resident Carol Allen, who rides the bus to Glendale and Pasadena, told LA Times the plan will divert traffic onto side streets like hers that retain left-turn access. “It all seems like we’re being used as basically an experiment for the rest of L.A.,” Allen said.
Nadine Levyfield, a community activist, said she supports a bus route but questioned why Eagle Rock cannot have the mixed-flow design planned for Pasadena, where construction is underway. “We want kids to be safe,” Levyfield said. “Yes, we don’t like the design, and we’re worried about traffic. But the No. 1 thing here is the safety.”
Metro began initial outreach in 2018 and the board approved the project scope and route in 2022. Supporters at the meeting, including resident Andrew Jacobs, said the process has been transparent. “This has been an ongoing process,” Jacobs said. “Will traffic get a little bit worse? It’s possible. But I also think I don’t know what the alternative is.”
Opponents countered that previous councilmembers were distracted. Jose Huizar was convicted on corruption charges, and Kevin de León lost reelection after a recorded racist remark. Jurado said she has pressed Metro for clarity on whether the bus corridor could trigger SB 79, a new state law allowing multifamily housing near transit.
“The implications depend on the property and local implementation rules; eligibility does not mean a development has been approved,” Jurado told LA Times. “Residents deserve clarity about those possibilities, with affordability and protections against displacement central to the conversation.”
Joshua Schank, a partner at InfraStrategies and former Metro chief innovation officer, said dedicated lanes benefit lower-income riders who rely on transit.
“There are a lot more people, and a lot lower income people, who are on the bus needing to get to places than there are people who desperately need that extra lane of traffic,” Schank said. “Drivers generally have access to far more places in a far shorter period of time than transit users in Los Angeles.”
Burbank has also pushed for mixed-flow lanes on its segment. Metro said it is currently securing final design approvals and traffic control packages from the city while coordinating construction permits. Mayor Karen Bass, the current Metro chair, presides over her last board meeting next month before Mayor-elect Nithya Raman, a bus-lane supporter, takes the helm.
Jurado, born and raised in Highland Park, is the first person of Filipino descent elected to the Los Angeles City Council. She defeated incumbent Kevin de León in the 2024 general election, a race shaped by his role in the 2022 City Council scandal, after working as a housing rights attorney focused on wage theft and eviction defense.
What comes next for the Eagle Rock segment
Metro must obtain city approvals on final design and traffic control plans before the January construction start. Jurado said she will continue pressing for safety mitigations — including speed humps on side streets — before work begins. The agency has not released a revised timeline showing whether the 16-month construction window still targets completion before the 2028 Olympics.
Keep reading