The Johor Bahru–Singapore RTS Link: A New Era of Cross-Border Transit
The Johor Bahru–Singapore Rapid Transit System (RTS) Link, an ambitious cross-border rapid transit project, is set to revolutionize connectivity between Malaysia and Singapore. This 4 km twin-track system aims to enhance the movement of people and goods, linking Johor Bahru in Malaysia with Woodlands North in Singapore. With a planned opening in January 2027, the RTS Link is on track to become a pivotal infrastructure in Southeast Asia’s transit landscape.
Construction and Technical Specifications
As of May 2024, the connecting viaducts in the Johor Strait were under construction, marking significant progress for the project. The RTS Link will feature two elevated and underground tracks, each 1,435 mm in standard gauge, with an operating speed of 80 km/h. The system will accommodate 8 four-car trainsets, each 76.04 meters long, with a narrow profile to fit the cross-border context.
Ownership and Operations
The RTS Link is a joint venture between InfraCo Malaysia and InfraCo Singapore, with RTS Operations Pte Ltd, a collaboration between Prasarana and SMRT Corporation, handling operations. The service is set to run under a 30-year concession, promising long-term benefits for both nations.
Ticketing and Fare Details
Ticketing details for the RTS Link are still being finalized, as reported by various news outlets. Malaysian Transport Minister Anthony Loke has indicated that proposed fare structures will be presented to the governments of Malaysia and Singapore, ensuring a collaborative approach to pricing and benefits for commuters.

Impact and Benefits
The RTS Link is expected to have a low impact from external geopolitical tensions, such as those in the Middle East, ensuring a stable operation. The project aims to maintain temporary shuttle services like Tebrau Shuttle, highlighting Malaysia’s hopes for continued cooperation with Singapore.
Key Takeaways
- The RTS Link is a 4 km cross-border rapid transit system linking Johor Bahru and Woodlands North.
- Planned to open in January 2027, it features both elevated and underground tracks.
- Operated by RTS Operations Pte Ltd, the system will run under a 30-year concession.
- Ticketing and fare details are still being finalized, with collaborative discussions ongoing.
- The project aims to enhance connectivity and economic integration between Malaysia and Singapore.
Looking Ahead
As the RTS Link approaches its final phase of construction, anticipation grows for its potential to transform cross-border travel and commerce. With both nations committed to its success, the RTS Link stands as a testament to regional cooperation and innovation in public transit.
Keep reading